# Allocation planning

See what’s coming. Plan what changes.

See who frees up, where you’re short, and what a move would do before you make it.

## Every discipline, every person’s time

See every discipline on one map, and anyone’s time in one click.

The company map regroups by discipline. Forward deployed engineering is opened: its people's faces appear, and a side list shows each person's projects and shares, 28.7 of 28.8 FTE allocated. The pointer rests on one person, Emerson Larkin: 60% Arclight, 40% Ashby advisory. Their profile opens on their assignments over time: Ashby ends in December and a tentative 40% on Poseidon takes its place.

## Every team’s people, month by month

Pick a discipline or team and see each person’s next six months.

The People tab, grouped by discipline. Forward deployed engineering is picked and its people line up as lanes across the next six months, one band per project: one person's work ends in December, another already has a tentative project lined up after this one. Then the grouping switches to teams, and one team, UMAV HIVE, shows its people the same way, each lane ending where their project does.

## Every project’s FTE, and where it’s short

Open any project: the FTE it has, the FTE it needs, month by month.

A project's page. The view moves in on its staffing: 1.4 of 2.4 FTE, short 1.0. Then its allocation over time shows each person's share across the months.

## Line up what’s next before a project ends

See whose work wraps up next, so the next assignment is ready.

A list of everyone's time, project by project, sorted by the next date it drops. The pointer follows the drop-off column, then lands on one person's unassigned 20%, in red.

## Say what the project needs, and see the gap

List the roles, how much, and for how long. Every gap gets a number.

A project's staffing plan: need, staffed, and gap for each role. A role is added, robotics software at 0.5 FTE, and the plan's total gap grows from 1.0 to 1.5.

## Everyone who could fill it, with what they’re on

Press an open seat to see who fits and what they’re on now.

An open seat is pressed. A list shows everyone who could take it with what they are already working on. Two people are ticked and added as candidates.

## Compare two people who are both busy

Put two busy candidates side by side and see which move costs less.

The two candidates are compared side by side. Both are on other work: one until mid-December, the other through June. The first is picked, a note says it puts them at 150% for now, and they join the team.

## See what a move costs before you make it

See everyone a change touches. Nothing is real until you say so.

The plan's review. The project goes from 3 to 4 people and 1.4 to 2.4 FTE, with no new staffing gaps. Under it, the other effect: the person picked would be at 150% from the plan's date.

## Start with a conversation

In 20 minutes, Adam maps your real operating model with you and finds one pain point Crouton can move on this week.

[Chat with us](https://usecrouton.com/planning#start)

## Does a plan change anything before we’re ready?

No. A plan is a draft of who would work where, from a date you choose. Confirmed assignments stay as they are until you implement it, and deleting a plan changes nothing.

## What if the person I want is already busy?

Usually they are. Compare candidates side by side with what each is already on, and when you pick one the plan says what it costs: who goes over capacity, and which project is left short.

## How is this different from allocation review?

Review looks back: each month, leads confirm who worked on what and at what percent. Planning looks ahead: what’s ending, who frees up, and what a change would do.

## How do I read the map?

Each hexagon is a person, on the project they work on. Solid means full time there, lighter means their time is split with another project, and a dashed outline is a seat still to fill.