See what’s coming. Plan what changes.
See who frees up, where you’re short, and what a move would do before you make it.
The whole company as a map of hexagons, one per person, grouped by project. It regroups by discipline and back, then one project is opened: its people's faces rise and a panel shows it is staffed 10.0 of 10.0 FTE, by discipline.
“Who do we actually have, and what are they on?”
Map
Every discipline, every person’s time
See every discipline on one map, and anyone’s time in one click.
The company map regroups by discipline. Forward deployed engineering is opened: its people's faces appear, and a side list shows each person's projects and shares, 28.7 of 28.8 FTE allocated. The pointer rests on one person, Emerson Larkin: 60% Arclight, 40% Ashby advisory. Their profile opens on their assignments over time: Ashby ends in December and a tentative 40% on Poseidon takes its place.
“Who’s on this team, and for how long?”
Disciplines and teams
Every team’s people, month by month
Pick a discipline or team and see each person’s next six months.
The People tab, grouped by discipline. Forward deployed engineering is picked and its people line up as lanes across the next six months, one band per project: one person's work ends in December, another already has a tentative project lined up after this one. Then the grouping switches to teams, and one team, UMAV HIVE, shows its people the same way, each lane ending where their project does.
“How much are we spending on this customer?”
Projects
Every project’s FTE, and where it’s short
Open any project: the FTE it has, the FTE it needs, month by month.
A project's page. The view moves in on its staffing: 1.4 of 2.4 FTE, short 1.0. Then its allocation over time shows each person's share across the months.
“Who’s rolling off next month?”
People
Line up what’s next before a project ends
See whose work wraps up next, so the next assignment is ready.
A list of everyone's time, project by project, sorted by the next date it drops. The pointer follows the drop-off column, then lands on one person's unassigned 20%, in red.
“What does this project actually need?”
Staffing plan
Say what the project needs, and see the gap
List the roles, how much, and for how long. Every gap gets a number.
A project's staffing plan: need, staffed, and gap for each role. A role is added, robotics software at 0.5 FTE, and the plan's total gap grows from 1.0 to 1.5.
“Who could take this?”
Candidates
Everyone who could fill it, with what they’re on
Press an open seat to see who fits and what they’re on now.
An open seat is pressed. A list shows everyone who could take it with what they are already working on. Two people are ticked and added as candidates.
“Which of these two?”
Compare
Compare two people who are both busy
Put two busy candidates side by side and see which move costs less.
The two candidates are compared side by side. Both are on other work: one until mid-December, the other through June. The first is picked, a note says it puts them at 150% for now, and they join the team.
“What breaks if I move them?”
Impact
See what a move costs before you make it
See everyone a change touches. Nothing is real until you say so.
The plan's review. The project goes from 3 to 4 people and 1.4 to 2.4 FTE, with no new staffing gaps. Under it, the other effect: the person picked would be at 150% from the plan's date.
How you work with us
Start with a conversation
In 20 minutes, Adam maps your real operating model with you and finds one pain point Crouton can move on this week.
Bring the messy version
Share the spreadsheet, org chart, notes, and edge cases you actually use.
We map it live
Together we trace owners, allocations, and the people behind each customer outcome.
Leave with a first use case
You walk away with one concrete workflow to test now.
Questions
What planners ask us
Something else on your mind? Chat with us and we’ll answer it with your own org in front of us.
Does a plan change anything before we’re ready?
No. A plan is a draft of who would work where, from a date you choose. Confirmed assignments stay as they are until you implement it, and deleting a plan changes nothing.
What if the person I want is already busy?
Usually they are. Compare candidates side by side with what each is already on, and when you pick one the plan says what it costs: who goes over capacity, and which project is left short.
How is this different from allocation review?
Review looks back: each month, leads confirm who worked on what and at what percent. Planning looks ahead: what’s ending, who frees up, and what a change would do.
How do I read the map?
Each hexagon is a person, on the project they work on. Solid means full time there, lighter means their time is split with another project, and a dashed outline is a seat still to fill.